Learning Center

Whether you’re looking for solutions to specific challenges or wanting to deepen your overall knowledge of secondary packaging, our Learning Center is designed to give you the resources to make confident decisions about your secondary packaging systems.
Filter by Category
Filter by Topic
Filter by Type
Kinetix 6000 drive

How-To

How to Read and Respond to Common K6000 Faults

Kinetix 6000 (K6000) fault codes can often be remedied with the right know-how. We’ll help you understand how to read power-ups, status lights, and fault codes, to get to the root cause of drive issues.

Read more »

Kinetix 6000 part with "discontinued" banner on top

Problems / Challenges

How Do I Navigate K6000 Obsolescence?

Allen-Bradley moved the Kinetix 6000 (K6000) servo drive to obsolete status, which means no new units and a used-only supply. We can help you navigate this change and offer options on how to proceed.

Read more »

Hand holding a security padlock next to the eight listed steps of lockout tagout

How-To

What is the Lockout/Tagout (LOTO) Requirement for Packaging Equipment? 

Lockout/Tagout (LOTO) is a federal safety requirement that makes sure machines are de-energized before maintenance. We’ll walk you through the eight-step procedure, explain your role, and show how it applies to the equipment you work with.

Read more »

Split image showing before and after of machine refurbishment

Comparisons

What Is Equipment Refurbishment and When Is It Better Than Replacement? 

Learn the 50% rule and a five-question framework to help you distinguish when refurbishment and when replacement makes the most economic and operational sense.

Read more »

OEE = availability x performance x quality

Secondary Packaging 101

The Three Components of OEE: Availability, Performance, Quality (and the Six Big Losses)

Understand the three independent components of OEE and learn how to identify which one is dragging your OEE down.

Read more »

Productivity comparison graphs of non-vertical startup and vertical startup

Secondary Packaging 101

Vertical Startup: Why It Matters

Vertical startup is the achievement of stable throughput and quality within days of going live, not just the installation event. Understand the difference and how you can plan for this success.

Read more »

Predictive vs Preventive Maintenance article header graphic - PF Curve

Secondary Packaging 101

Predictive vs Preventive Maintenance: How Do They Differ?

Learn how to tell which type of maintenance your high-value assets need and where traditional maintenance still makes business sense.

Read more »

Colorful charts and documents on wall

Problems / Challenges

Packaging Equipment Project Timelines: Why They Range from 4 to 18 Months

Understand which dependencies are on the critical path and the cost/benefits of timeline compression so you can negotiate timelines that protect both schedules and production success.

Read more »

Two engineers collaborating at a desk

Secondary Packaging 101

URS, FDS, and FRS: A Buyer’s Guide to Packaging Project Specifications

Understand the roles of these three core specification documents and when each one is required so that you can save your project from FAT failures and costly rework.

Read more »

»

How-To, Secondary Packaging 101

A Buyer’s Guide to Automating Frozen Pizza Packaging Lines

Walk through the most important factors to consider when automating frozen pizza packaging—so you can make a confident, future-proof decision.

Read more »

How-To, Secondary Packaging 101

How to Automate Variety Pack Production Without Overbuilding or Overpaying

Learn which type of automation is right for your production scale, space, and SKU needs—whether you’re packing beverages or assembling snack assortments.

Read more »

People talking in front of top load case packer

Cost & Price

How Much Does a Top Load Case Packer Cost? Budgetary Pricing & Key Factors That Impact Price

Learn the budgetary price ranges you can expect, along with the specific factors that drive those prices.

Read more »

Douglas Service Technician working on machine

Problems / Challenges

How Quickly Can I Get a Service Technician to My Site?

Get realistic timelines for emergency and planned service, plus practical steps that can reduce delays by days.

Read more »

Comparisons

Managing Replacement Parts for OEM Equipment: Choosing the Right Partner Model

Break down the real-world pros, cons, and risks of sourcing parts from OEMs, distributors, or directly from component manufacturers.

Read more »

Comparisons

U.S.-Made vs. Imported OEM Packaging Equipment: Which Is Actually Better in the Long Run?

Get a side-by-side breakdown of what makes one operation more cost-effective than the other—in terms that refelct the realities of manufacturing operations.

Read more »

« »