Case Study

Engineering Partnership That Fits

How Bob’s Red Mill built a long-term case packing strategy with Douglas.

The Challenge

Bob’s needed to overhaul and expand case packing across several production lines. Their equipment struggled with consistent case packing and manual intervention. The biggest constraint? Floor space was limited, and Douglas’ existing footprint exceeded what the plant could accommodate. At the same time, Bob’s wasn’t willing to compromise on:

High-quality product handling

Integration with new/existing lines

Long-term reliability

Service responsiveness

The Solution

Valuing the partnership, Douglas suggested the two teams work together to design a solution. In live 3D CAD modeling sessions, both teams reviewed:

Exact machine footprint

Technologies applied

Maintenance access points

Operator considerations

Bob’s engineers could get a realistic view of the equipment in real time and identify potential issues so adjustments could be made early in the process.

Throughout the partnership, Bob’s routinely brought their most difficult products and packaging scenarios into the evaluation process. The toughest SKUs became the benchmark.

The Results

What began as a footprint redesign evolved into a long-term automation partnership. Today Bob’s Red Mill operates 10 Douglas machines, each model evolving from the one before it.

The impact of the 3D collaborative CAD modeling was significant. The experience was so effective that 3D model reviews are now a requirement in Bob’s procurement process.

Reduced Complexity

With Douglas as a proven partner, Bob’s knows what to expect, how the equipment performs, and how the team responds.

Cultural Alignment

Both companies share values stemming from an employee-ownership mindset. This fosters long-term accountability and transparency.

Value Beyond Price

Douglas is not always the lowest cost. Decisions are instead centered on long-term performance, engineering collaboration and predictable results.

At a Glance

About

For nearly 50 years, Bob’s Red Mill has produced whole grain and gluten-free foods with a commitment to quality and employee ownership.

Headquarters

Milwaukie, Oregon

Douglas Machines Installed

10

Results
  • Reduced downtime risk
  • Responsive tech support
  • Confident bag handling & case loading
  • Reduced manual intervention
  • Streamlined installation planning
  • 3D collaborative modeling now an internal evaluation standard
Download Case Study PDF

Very little cons and a lot of pros. I have a very good track record with Douglas. I know the level of quality I’m going to get from them.

Nick C.

Bob’s Red Mill Engineering Fabrication Manager

Have Questions? We're Listening.

When you work with Douglas, you get more than a well-built system—you gain a partner focused on supporting your operation from day one and for the long term.